The software contains method statements for each energy efficiency measure,  default risk assessments and Toolbox Talks within a powerful database, these can be easily duplicated, the assessment automatically includes all of the relevant project details. Each risk assessment can be customised where specific hazards are present in a project. The built-in PDF printer and contact list allows you to issue copies of the risk assessments individually to all relevant parties via e-mail with the correct information inserted into the assessment.

Key Benefits

  • Automatically produce method statements, risk assessment templates and toolbox talks with buit-in mailmerge information of project details

  • Database system not MS Word documnents, you can duplicate and create your own templates. See the tutorials to find out how simple it is.

  • PDF Printer and email interface. No need for Adobe Acrobat.Issue assessments to multiple users via e-mail using a distribution list

  • Save PDF versions of the issued documents to your computer. No need for confusing system managing file names of various documents.

  • Database includes contact list to insert information into the templates Incorporate your logo and signature automatically in the documents

Method Statements

A method statement is available for each green deal energy efficiency measure. For example if you are carrying out loft and cavity wall insulation you will include two method statements within the project and the customer's details are automatically inserted into the method statements.

 

 

Heating, ventilation and air conditioning

Condensing boilers

Heating controls

Under-floor heating

Heat recovery systems

Flue gas recovery devices

Heating system insulation (cylinder, pipes)

Building fabric

Cavity wall insulation

Loft insulation

Flat roof insulation

Internal wall insulation

External wall insulation

Draught proofing

Floor insulation

 

Microgeneration

Ground, Water and Air source Heat Pumps

Solar thermal

Solar PV

Biomass boilers

Micro CHP

Fenestration

Energy Efficient Glazing and Doors

Risk Assessments

The risk assessments included in the package are as follows:

Carpentry and Joinery
Door Furniture Fitting And Replacement
Timber Window Furniture Replacement
Suspended Ceilings
On Site Work
Workshop Activities
Operation And Use Of Dust Extract System

Electrical
Electrical Fault Finding Electrical Circuits
Installation Of Cable Trunking/Cable Trays
Electrical works 415 Volts
Batteries Charging and Servicing
Installation/Maintenance Of Lead Acid Batteries
Replacement Of Electrical Component
Installation Of Electrical Supplies
Electrical Fault Finding Control Circuit
Temporary Electric Supply
Electrical Testing
Work Within Hv Switchrooms/Transformer Pens
Overhead Power Lines
Lamp Changing (Internal)
Install/Replace Fluorescent Luminaires (Internal)
Installing/Replacing Fluorescent Luminaires
Test or Change of Electric Motor

Excavations
Work in excavations

Flammable Liquids
Fire Control
Flammable Liquids
LPG

Handtools
Abrasive Tools
Generic Handtools
Cartridge Fixing Tools
Vibrating Tools

Manual Handling
Manual Handling
Slinging of Loads
Paving

Materials
Asbestos
Chasing out cable runs
Leadwork
Waste Materials

Mechanical
Grinding
Flame Cutting/Welding Operations
Gaswork
Glazing
Plumbing
Sheet Metalwork & Ductwork
Workshop Machine Tools
Drain Systems
Safe Use Of Blow Lamps

Moving Vehicles
Fork Lift Trucks
Mobile Cranes
Dump Trucks
Excavators

Plant and Equipment
Compressors
Grinders
Materials Hoist
Lifting Equipment

Site Guidance
Confined Spaces
Occupied Premises
Underground Services
Site Offices and Facilities
Storage of Goods
Working Alone

Working at Heights
Ladders
Mobile Access Platforms
Roof works
Scaffolding
Scaffold Towers
Trestles